STABILITY CHAMBER Cleaning SOP



1.0  OBJECTIVE:
To lay down the procedure for cleaning of Stability chamber 30oC/65% RH.
2.0  SCOPE:
This SOP shall be applicable to the Stability chamber 30oC/65% RH installed, at Quality Control Instrument Lab.
3.0  RESPONSIBILITY:
3.1  Technical Assistant/ Helper.
3.2  Q.C Analyst.
4.0  ACCOUNTABILITY:
4.1  Manager-Quality Control.
5.0  MATERIAL AND EQUIPMENT:
5.1  Stability chamber 30oC/65% RH.
5.2  Dry clean cloth.
5.3  Detergent solution.
5.4  Purified water.
6.0  PROCEDURE:
6.1  Ensure the power supply to the humidity chamber is switched “OFF”.
6.2  De-dust the chamber externally with a clean dry cloth.
6.3  Once a week remove adhered dust by wet mopping using detergent solution.
6.4  Subsequently wipe the surface with a clean dry cloth to remove trace of detergent.
6.5  Once in a month, mop the interior surfaces with clean dry cloth.
6.6  Affix the “CLEANED” label and fill the “Cleaning Equipment Log Book”.
7.0  REVISION LOG:
Revision No.
Effective Date
Reason
00

New SOP



8.0  REFERENCES:
8.1  Not Applicable.
9.0  ANNEXURES:
Annexure 1: Cleaning record of Stability chamber 30oC/65% RH.


Annexure: 1
Cleaning record of Stability chamber 30oC/65% RH
CLEANING RECORD OF STABILITY CHAMBER 30oC/65% RH
Date
Cleaned by
Checked by
Remarks 























































































10.0    ABBREVIATIONS:
Abbreviation
Expanded Form
SOP
Standard operating procedure
&
And
No.
Number  
Ltd.
Limited
QCEC
Quality control Equipment cleaning
Q.C
Quality control
oC
Degree centigrade
%
Percentage
RH
Relative humidity


No comments:

Post a Comment